In order to give us some room to build the new buck fortress palace, we needed to move a few fence lines around. The boys needed to stay secure at the same time, since we didn’t want to spend the better part of the day chasing them back home.

Fence Line Shifting

We had an old chain link kennel that we used if we needed to keep one of the animals separate for a few minutes. We expanded it and are using it as part of a temporary fence and the entrance gate. Once we had the front fenced off, the Anatolian wasn’t too sure about the new pen. It was a lot smaller than he liked and it made him a bit nervous. He pretty much gave in once the back part of the old fence came down and he had access to about three times the amount of space.

Rotten Fence Post

This is one of the corner posts we put in 10 years ago. It was just part of a fir tree that we cut into logs to use as fence posts. The fence panels were only things that were holding it up! The chickens are having a field day picking the rotten log apart and snacking on the grubs!

Construction Area Clear

Here it is all ready for the next phase. I think Eric will bring in the tractor and try to level out the ground as much as possible. There are some pretty good ruts along the former fence lines. I’m thinking about ways to mitigate that problem for next fall. I am looking at installing some of that weed block type fabric and then covering it with gravel around the areas that will get the most traffic. It looks like it does a pretty good job around the high traffic areas in horse stables. I’m all for avoiding large mud holes if I can.

Otis, King of the Spool

While we still have plenty of work to do, Otis is enjoying the new pasture space and a new spool. You can see the line in the grass in front of the spool where the old fence came out.

Advertisements